Turnkey Projects |
Company Represented / Consulted |
|
TEAS Cooling water systems for Kemerkoy Power
Plant |
Riva Calzoni S.p.AJltaly |
|
TT CATV Ankara (%50) and Adana |
NKF/Holland
(consortium leader), Philips/Holland,
STFA/Turkey |
|
TT Trunk and junction fibre optic cable
projects (4/6/10/20 fibers, 4500 km) |
NKF/Holland |
|
TT Optical Fiber Project, Primary Cable (50
fibers, 250 km) |
NKF/Holland, Turkkablo/Turkey |
|
TEAS Gas Insulated Substations 8 Substations,
154kV |
Holec/Holland |
|
TEAS 154kV XLPE Cable Turnkey Project (10 km
route single circuit) namely Yenibosna-Veliefendi |
NKF/Holland,
Yuksel/Sasel/Turkey Consortium |
|
TT Local Networks (Konya-Adapazari) (230,000
line units outside plant) |
Turkkablo, T-Kablo,
Cenay/Turkey Consortium |
|
TEIAS Gas Insulated Substations 3 substations,
154kV, namely Piyale, Vanikoy, Ilica |
Elin Holec/Holland &
Gunes (Barmek Holding
Company) Consortium |
|
Transmission Equipment, OPGW for Jordan-Egypt
Project |
Nokia/Finland |
|
TT Optical Fiber Cable for Trunk and Junction
Connections |
Turkkablo/Turkey |
OPGW for various TEIAS Projects such as
- to Ozdil Energy for H-151 and H-13 8 TEIAS OHL
project
- to MITAS for H-147 TEIAS OHL
- to GALKON for H-148 TEIAS OHL
- to MITAS for H-155.1 |
Nokia/Finland
NK Networks/Germany |
TT Local Networks (Kayseri-Zonguldak-
Antalya Bati - Mersin)
(min. 135,000 line units per year) |
T-Kablo,
Cenay/Turkey Consortium |
|
TT Optical Fiber Cable for Trunk and Junction
Connections and Installation |
Turkkablo, T-Kablo/Turkey |
|
TEIAS 154kV XLPE Cable Turnkey Project (two
routes of 2.5 and 3.5 km; single circuit) namely
Levent-OHL (Maslak) and Levent-Etiler |
NKF/Holland, NKF/Turkey |
TEAS ITM-15 Sub Station Project
Two new, one ext. 380 kV S/S namely, Denizli,
Seydisehir and Konya 4 and five 154 kV S/S
extensions namely Kucukbakkal, Umraniye, Maslak,
Corlu and Hamidabat |
Elin Elmak
(V.A.Tech Elin Austria Group
Company)Turkey |
TEIAS Gas Insulated Substations 2 substations,
154kV
namely Bahcelievler, Yildiztepe
and Veliefendi (ext) |
Elin Holec/Holland &
Elin Elmak Consortium |
|
TEIAS 154kV XLPE Cable Turnkey project namely
Yenibosna- Bahcelievler |
NKF/Holland, NKF/Turkey |
|
IS-TIM / ARIA GSM Base Station Installation |
NKF/Turkey |
|
WAPDA Gas Insulated Substation 132kV & HV
Cables Lahore, Pakistan |
Elin Holec/Holland
and
Pirelli
(nominated
subcontractor) |
|
ERDEMIR Gas Insulated Substation 154kV |
Elin Holec/Holland
(nominated subcontractor) |
|
TEIAS 154kV XLPE Cable Turnkey Project namely
Selimiye-Goztepe |
Pirelli/Turkey |
|
TEIAS 154kV XLPE Cable Turnkey Project namely
Hisar-Haskuy |
Pirelli/Turkey |
Turkish Telecom
Supply of 300 each fiber optic roof Modules |
Atilla Dural / Tyco |
EUAS
Supply of HV and neutral bushings for
Ataturk HEPP |
Trench France S.A. |
TEIAS
Supply of 22 units 420 kV circuit breakers |
Nuova Magrini Galileo SPA |
TEIAS 154kV XLPE Cable Turnkey Project
namely Balgat s/s - Golbasi s/s and Haskoy s/s -
Mamak s/s |
Pirelli/Turkey |
TEIAS
Supply of shunt reactors, line traps, Current
limiting reactors, bushings (last 5 years'
operational supplies) |
Trench |
SIEMENS TURKEY
Supply of IT's, LT'S for the Iraq Mussaib, SS-174/2000
projects |
Trench |
TEMSAN
Supply of IT's and LT's for TEIAS
ITM-23 project |
Trench |
TULOMSAS
Supply of wheel sets and blank axle gears |
Lucchini |
ISKENDERUN ENERGY PRODUCTION AND TRADING INC.
420 kV CT (SF6 insulated) and 420 kV CVT
|
Trench |
TRAKYA J/V and HORASAN J/V
OPGW for TEIAS H-186 and H-192 projects |
Draka |
AKSA A.S.
OPGW for Cyprus Project |
Draka |
TURKISH TELECOM
Supply of 880 each fiber optic roof Modules |
Atilla Dural / Tyco |
|
TEIAS 170 kV Gas Insulated Substations namely
Semikler and Haskoy |
VA Tech T&D GmhW
Va Tech T&D SA / Elin
Elmak Consortium |
SIEMENS TURKEY
IT's, LT's and DS's for Iran Rudeshure Project |
Trench and Hapam |
|
TEIAS 380 kV XLPE Cable Turnkey project
namely Davutpasa-Ikitelli |
Turk Prysmian Kablo |
|
TEIAS 154 kV XLPE cable Turnkey project
namely Etiler-Alibeykoy |
Turk Prysmian Kablo |
|
SIEMENS TURKEY HV IT's and OPGW for Ethiopia Gilgel
Gibe 2 Project |
Trench and Draka |
|
OZDIL Energy OPGW for Iraq Project |
Draka |
SARA Energy
OPGW for Iraq Project and Algeria Project |
Draka |
GUNGOR Electric
170 kV switchyard equipment |
Atilla Dural Ltd. |
|
TEIAS (2006-IKO/2) Line Traps |
Trench |
|
TEIAS 154 kV XLPE Cable Turn key project namely
Atisalani-Bagcilar |
Pyrsmian |
Beykoz TEIAS 380 kV
Gas Insulated Substation” |
Siemens |
|
* TEIAS 380 kV XLPE Cable Turn key project namely
Dudullu-Pasakoy |
Pyrsmian |
|
* Istanbul Ulasim A.S. Metro wheels |
Lucchini |
|
Areva T&D Turkey and BEST A.S.
Bushings |
Trench |
|
* TUBITAK Uzay Reactors |
Trench |
|
SARA
Energy OPGW for Algeria |
Draka |
* Iskenderun Demir ve Celik A.S.
154 kV XLPE Kablo |
Pyrsmian |
|
* Zorlu Energy Reactors for Tereshkovo and Kojuhovo |
Trench |
|
* Turkish contractors Line traps and reactors for TEIAS projects |
Trench |
* AKSA Energy
Line traps and HV instrument transformers |
Trench |
* ABB Turkey
HV instrument transformers |
Trench |
Diler 380 Kv AIS
Civil works construction works |
Atilla Dural Ltd. |
* MAPA Insaat A.S.
DSI Supply of Drinking Water for
Istanbul Metropolitan
Supply and installation of HV energy cable within
the scope of package No.l1 |
Atilla Dural Ltd. |